SGCR is a single platform for the procedures, obligations and inspections of all your stations before ASEA, CNE, SAT, PROFECO and local authorities, with warnings before each due date.
Situation of the universe of service stations and LP gas plants in Mexico, 2025-2026.
Gas stations and LP gas plants identified by ASEA as parties obligated to register; 16,374 completed the procedure and 2,291 were left out.
Proportion of registered facilities with inconsistencies in their environmental impact authorizations.
4,310 inspections and 3,650 supervisions scheduled by state between August 2026 and 2028 under PRONAGAS.
About 20% of the more than 14 thousand service stations in the country operate without a valid Single Environmental License.
PRONAGAS changed the logic of oversight: from an administrative registry to a public calendar of visits by state, with a date assigned to each facility. Inspection is no longer a remote possibility; it is scheduled.
Own work based on PRONAGAS data published in the Official Gazette of the Federation on April 30, 2026 (ASEA, 2026a), Energía a Debate (2026) and Reforma (2026).
What happens today in a group with several stations under one headquarters.
ASEA, CNE, SAT, PROFECO and state or municipal civil protection, each with its own calendar, format and response deadline.
The Single Environmental License, operating license, opinions, tightness tests and calibrations expire on different dates for each station.
Part at the station, part with the accountant, part with the environmental consultant. When the inspector arrives, nobody has the complete record.
The visit is a surprise and the response deadline runs from the inspection record. Without locatable documentation, the deadline runs out while looking for papers.
Management cannot say with evidence which of its stations is at risk of closure this week.
The manager who knows the procedures leaves and takes the station's history with them.
At a service station, a single missing document can stop fuel dispensing the same day it is detected.
Three federal authorities sanction with fines set in UMA, and each can stop the operation on its own.
| Violation | Authority | Maximum fine | Scale | In addition to the fine |
|---|---|---|---|---|
| Violations of the ASEA Law, its regulations and provisionsASEA Law, art. 25, sec. IV · 750,000 to 7,500,000 UMA | ASEA | $88.0 – $879.8 M | Temporary or total closure and suspension of activities | |
| Operating without a valid retail sale permitLSH, art. 121, sec. II, item h · 344,000 to 1,032,000 UMA | CNE | $40.4 – $121.1 M | Revocation of the retail sale permit | |
| Quality, quantity and measurement of the fuelLSH, art. 121, sec. II, item i · 138,000 to 690,000 UMA | CNE | $16.2 – $80.9 M | Revocation of the permit and immobilization of dispensers | |
| Terms and conditions of the permit: reports and guaranteesLSH, art. 121, sec. II, item b · 34,000 to 344,000 UMA | CNE | $4.0 – $40.4 M | Sanctioning procedure before the Commission | |
| Restricting inspectors' access to the facilityASEA Law, art. 25, sec. I · 75,000 to 225,000 UMA | ASEA | $8.8 – $26.4 M | Sanctioning procedure and a new inspection visit | |
| Reports to ASEA: SASISOPA, Single Environmental License, opinionsASEA Law, art. 25, sec. II · 7,500 to 150,000 UMA | ASEA | $0.9 – $17.6 M | Partial or total closure of the facility | |
| Volumetric controls: equipment, opinions and reportsFederal Tax Code, arts. 81 and 82, sec. XXV | SAT | $1.1 – $3.4 M | Closure of the establishment for one to three months |
In addition to the fine, each day of closure is a day without fuel sales. Amounts using the 2026 UMA of $117.31 (INEGI, 2026); the authority sets the amount of each case within the range. Bars on a logarithmic scale.
Each with its own file, its own calendar and its own power to close.
Single Environmental License · SASISOPA · environmental impact · NOM-005 and NOM-004-ASEA · tightness tests.
Immediate closureValid permit · NOM-016-CRE on fuel quality · reports, information and guarantees.
Revocation of the permitSystem certified under Annex 21 · opinions · reports · hydrocarbons CFDI complement.
Closure of 1 to 3 monthsDispensing of full liters · seals and calibration of dispensers · price information.
Immobilization of dispensersInternal civil protection program · fire department approval · drills and training.
Suspension of activitiesOperating license · land use · signage · discharges and waste.
Municipal closureEach authority can stop the operation on its own. SGCR does not replace any of them: it brings them together in a single file per station.
The platform that lets a gas station group shield the operation of all its stations, managing from one place what today lives scattered between five authorities and half a dozen providers.
Procedures, obligations, inspections and regulations of all stations, in one place.
Traffic lights that warn before the due date and escalate to headquarters according to criticality.
Immutable log, file per station and version control of every document.
Compliance level in real time, per station or consolidated for the group.
Expected result: operational continuity. No station closed because of an expired paper.
Screenshots of the platform running with a demo gas station group of six stations. Click any of them to see it larger.
Main objective: to manage, control and automatically follow up all the procedures, obligations and inspections —federal, state and municipal— of each service station, from a single platform, to ensure operational continuity.
Control of the documents whose absence stops dispensing the same day.
Traffic lights per station for licenses, opinions, calibrations and tests.
A digital file per station, ready to hand over at an inspection.
Reuse of data between procedures that ask for the same information.
Compliance level per station and consolidated for the group.
Log and versioning that survive manager turnover.
Aligned with the best practices of a compliance management system (ISO 37301:2021) and with the preventive approach that ASEA itself requires of regulated parties.
Each business unit is a service station.
Retail sale permit, articles of incorporation, property and station data.
Single Environmental License, environmental impact, municipal license.
SASISOPA, tightness, vapor recovery, volumetric control.
Inspections by ASEA, PROFECO, civil protection and the municipality.
Each element automatically generates its folder inside the station's single file. Rules: N stations per group · each station has an Operator · the station identifier is only visible to its organization.
Gas station group, its stations, general data and legal documents.
From filing to resolution: licenses, authorizations and permits before authorities.
Recurring duties that don't go through a counter: tests, reports and calibrations.
Inspections by ASEA, PROFECO or civil protection and their response within the deadline.
Current NOMs, laws and agreements, linked to what they give rise to at each station.
Single file per station, with completeness checklists.
Example: application for a Single Environmental License before ASEA.
The procedure record is created and the station's initial documentation is gathered.
It was filed with ASEA; the warning and resolution deadlines start running.
The authority requires clarifications or missing documentation.
The warning was cured and the authority continues its analysis.
The license is issued, denied or made conditional on additional measures.
Favorable resolution and filed only once.
Approved, but with periodic renewal: license, opinion or report.
Denied; a new procedure is started from the same file.
Finished or replaced by a new version of the form.
An estimated 40 to 50 procedures per station, and more than 100 in complex cases. Each version of a recurring procedure keeps its identifier and moves to the history.
III-ESU-TR-FED-…).The two fronts where a service station is most often lost.
Duties the station fulfills by itself, without a procedure at a counter, but verifiable by the authority.
Inspections by authorities. With PRONAGAS they stopped being exceptional: there is a calendar by state.
The response deadline for an inspection runs from when the record is signed. Having the file assembled before the visit is what turns an observation into a procedure and not into a closure.
Example: from NOM-005-ASEA-2016 (design, construction and operation) specific procedures, obligations and inspections are derived:
Why it matters in this sector: the standard in force today is about to change; the draft PROY-NOM-023-ASEA-2025 seeks to replace NOM-005-ASEA-2016. When it changes, the system tells you which forms and which stations need updating, and each previous version is kept: the historical file is judged under the standard in force at the time.
Only the Administrator creates and updates regulations; records in progress are not visible. PROY-NOM-023-ASEA-2025 was in public consultation until February 2026 (ASEA, 2026b).
Applied to the due dates that stop fuel dispensing.
Within the safe deadline.
Notifies the station's Operator.About to expire.
Notifies the Operator and the group's Administrator.Expired or at critical risk.
Notifies the Operator, the Administrator and management.Single Environmental License, operating license, retail sale permit, land use.
NOM-005-ASEA opinion, tightness, vapor recovery, calibration of dispensers.
Submission of volumetric control reports and validity of the digital seal certificate.
The alert repeats every day until the matter is handled; it cannot be silenced.
Alerts arrive through the dashboard and email; the days-remaining rule is configurable and global for the whole organization.
Configures the system, creates forms, users and stations, defines traffic-light rules and non-business days, and follows regulatory changes.
Scope: the whole groupManagement and board: they view dashboards, reports and information of all stations. They do not enter or modify information.
Scope: the whole groupRecords and updates daily the procedures, obligations and inspections of their station, and selects the due dates.
Scope: only their stationThe Administrator and Operator roles can be contracted as a service. You decide whether your own staff fill these roles or whether we operate them on your behalf. Whoever enters data does not configure, and whoever configures is not who consults: that is how the integrity of the file is protected against an audit.
We survey, in the field and digitally, the current and historical regulatory inventory of each station.
Templates are configured and the procedures, obligations and inspections of each station are entered.
Filings, warnings, resolutions, inspection records and due dates are recorded.
The traffic light changes color and notifies; red escalates to headquarters and repeats every day.
Management prioritizes resources, anticipates risks and proves compliance to partners and banks.
All of the group's information is private and is kept on the platform with an access log.
Record of who did what, when and from where, with twelve-month retention.
What is entered for one procedure is reused in the others that ask for the same thing.
The underlying benefit: at a gas station, compliance is not a legal matter: it is the condition for continuing to dispense. SGCR turns that risk into a dashboard that management can see, measure and anticipate.
Five options that can be contracted separately or combined; the final cost depends on the combination chosen.
Access to the six modules, dashboards, alerts, reports and digital file.
Monthly, per stationTraining of Administrator, Executive and Operator users on the platform and its flows.
One-time paymentMATOVE, template configuration and entry of the current and historical inventory.
One-time payment, per stationWe take on the role: configuration, templates, users, traffic-light rules and regulatory changes.
Monthly, by the hourWe take on the role: daily entry of procedures, obligations, inspections and due dates.
Monthly, per station1License only. The group operates with its own staff.
1 + 2 + 3 + 4License, training, initial load and Administrator. The operator is the customer's.
1 + 2 + 3 + 4 + 5All five options. We survey, configure and operate for the group.
The platform license is the only indispensable option; the other four are optional and quoted independently. Support, storage and hosting are adjusted to the degree of technological integration of your organization, which is determined with a questionnaire before contracting.
Three sequential services turn each station's scattered archive into a living file.
Mapping of Existing Procedures, Obligations and Inspections. Field and digital survey of each station's regulatory inventory: digitization, analysis, classification and filing in a database.
Two visits per station, plus headquarters
Configuration of the forms. A template is configured for each type of procedure identified in the MATOVE, with its fields and required documents.
One template per procedure type
Entry of the current and historical inventory. Procedures, obligations, inspections and regulations of each station, with their documents, dates and status.
Leaves the file ready to operate
The Regulatory Compliance Analysis assesses the degree to which the organization meets its obligations and delivers the Regulatory Compliance Degree Report by level of government: federal, state and municipal. Quoted separately.
An empty platform protects nobody. The mapping and the initial load are the work that turns the license into operational continuity.
Three components with their own periodicity, combined according to what each organization needs.
We survey the information, configure the platform and operate it on your behalf, with the Administrator and Operator roles. It is the reference scheme: it includes the three components.
From there, any combination is possible: you contract what each organization needs and its budget allows, from the license alone to the complete scheme.
Four steps to go from conversation to operation.
We show you the platform running with examples from the sector: licenses, opinions, inspections and traffic lights.
Quote by components, according to how many stations and how much support you need.
MATOVE, initial loading of the file, platform configuration and training.
Start of day to day: active alerts, living file and dashboards for management.
No. SGCR does not replace any authority or any of their providers: it brings together in a single file per station what today lives scattered between the station, the accountant and the consultant, and warns before each due date.
ASEA (energy-sector safety and environmental agency), CNE (energy commission), SAT (tax authority), PROFECO (consumer protection agency), state and municipal civil protection, and the municipality (land use and operating license). The catalog of authorities is editable, so any other can be added.
Yes. The Administrator and Operator roles can be contracted as a service: from the license alone, operated by your staff, to the turnkey scheme.
Each regulation keeps its link to the procedures, obligations and inspections it gives rise to. When the standard that replaces it is published, the system tells you which stations and which opinions need updating, and keeps the previous version to defend the history.
Yes. SGCR is generic: organizations, business units, authorities, states and procedure templates are configured from a screen. This page presents it applied to service stations because that is where the inspection calendar is tightest today; we use it the same way with industrial plants, clinics or work centers.
Yes. SGCR is a module of the Fisher Networks ERP/CRM platform: it shares users, roles, document storage, email, artificial intelligence and REST API with the rest of the modules.
See it operate with real cases from the gas station sector: licenses, opinions, inspections and traffic lights.
The screenshots are from a demo environment with a fictitious gas station group; no data corresponds to a real station.